Logo MATTM
IT
Menu
  • Home
  • Search
    • Plans and Programmes
    • Projects
  • Procedures
    • On-going Procedures
    • Notices to the public - EIA
    • Notices to the public - EIA Screening
    • Submit Comments
    • Decisions
    • Transboundary consultations
    • Integrated and coordinated procedures
    • Statistics
    • Environmental Observatories
  • Data and tools
    • Environmental Data
    • Technical specifications and forms
    • Legislation
    • Sector studies and investigations
  • Communic-Action
    • Citizen Area
    • Developer Area
    • News and Events
    • Decisions 2018
    • News from the Directorate-General
    • Legal Area
  • Links
    • SEA and EIA at regional level
    • IPPC permit
    • Links
  • Contact Us

Environmental Assessments: SEA - EIA

  • 10/04/2018 - EIA - Repowering of the Mineo-Militello-Vizzini wind farm - Launch of public consultation
    10/04/2018 - EIA - Repowering of the Mineo-Militello-Vizzini wind farm - Launch of public consultation Map
  • 10/04/2018 - EIA Screening - Brindisi sud "Federico II" thermal power plant - First rain water tanks - Launch of public consultation
    10/04/2018 - EIA Screening - Brindisi sud "Federico II" thermal power plant - First rain water tanks - Launch of public consultation
  • 09/04/2018 - EIA (Strategic Law) - Fortezza-Verona line southern access to the Brenner Base Tunnel - lot 1 Fortezza-Ponte Gardena: Variants - Launch of public consultation
    09/04/2018 - EIA (Strategic Law) - Fortezza-Verona line southern access to the Brenner Base Tunnel - lot 1 Fortezza-Ponte Gardena: Variants - Launch of public consultation
  • 09/04/2018 - EIA (Strategic work Law) - E78 motorway - Grosseto-Siena section  km 41+600 - 53+400 - Lot 9 - Launch of public consultation
    09/04/2018 - EIA (Strategic work Law) - E78 motorway - Grosseto-Siena section km 41+600 - 53+400 - Lot 9 - Launch of public consultation Map
  • 06/04/2018 - EIA - Hydroelectric facility of Agosta (RM) - Launch of public consultation
    06/04/2018 - EIA - Hydroelectric facility of Agosta (RM) - Launch of public consultation
  • 26/03/2018 - EIA - Seismic mapping in the area of hydrocarbons exploration permit "d 84F.R-EL" - Launch of public consultation
    26/03/2018 - EIA - Seismic mapping in the area of hydrocarbons exploration permit "d 84F.R-EL" - Launch of public consultation Map
  • 22/03/2018 - Single Environmental Permit - Reconstruction of the 132 kV T.153 power line "La Casella - Broni - Arena Po" - Republication
    22/03/2018 - Single Environmental Permit - Reconstruction of the 132 kV T.153 power line "La Casella - Broni - Arena Po" - Republication Map
  •  21/03/2018 - EIA screening - Execution of injection tests in the BB1 field of San Potito - Launch of public consultation
    21/03/2018 - EIA screening - Execution of injection tests in the BB1 field of San Potito - Launch of public consultation Map
  • 20/03/2018 - EIA (Strategic works Law 443/2001) - S.S. 291 "Della Nurra" - Construction of Lot 1 and of Lot 4 - Launch of public consultation
    20/03/2018 - EIA (Strategic works Law 443/2001) - S.S. 291 "Della Nurra" - Construction of Lot 1 and of Lot 4 - Launch of public consultation Map
  • 20/03/2018 - EIA screening - Access road to Napoli Afragola HS station - Launch of public consultation
    20/03/2018 - EIA screening - Access road to Napoli Afragola HS station - Launch of public consultation Map
  • Directorial Decree “Contents of forms for the submission of the check lists for wind farm"
    Directorial Decree “Contents of forms for the submission of the check lists for wind farm"
On-going Procedures
On-going Procedures
Decisions 2018
Decisions 2018
Notices to the public
Notices to the public
Citizen Area
Citizen Area
Developer Area
Developer Area
Technical specifications and forms
Technical specifications and forms

HIGHLIGHTS

  • 967
    Decisions

    Decisions

    18 April 2018

    EIA Follow-up (Strategic works Law 443/2001): A3 motorway Salerno-Reggio Calabria - lot 4 from...

    READ MORE
  • 1143
    Decisions

    Decisions

    18 April 2018

    EIA Compliance: "Ripalta Storage" Concession - Expansion of the storage capacity

    READ MORE
  • 625_TAP
    Decisions

    Decisions

    16 April 2018

    EIA Compliance: Trans Adriatic Pipeline - Albania-Italy pipeline - Prescription A.5

    READ MORE
  • 1714
    Decisions

    Decisions

    16 April 2018

    EIA Screening: Reconstruction of the Rivalta di Torino thermal power plant with endothermic...

    READ MORE
  • 568
    Decisions

    Decisions

    13 April 2018

    EIA: Drilling of the exploration well "Vesta" within the second phase of the work plan related...

    READ MORE
  • 1145_PRP_Trieste
    Decisions

    Decisions

    12 April 2018

    EIA Compliance: Port of Trieste Master Plan

    READ MORE
  • 739
    Decisions

    Decisions

    11 April 2018

    EIA Compliance: Modifications to the thermal power plant of Porto Marghera

    READ MORE
  • 625_TAP
    Decisions

    Decisions

    11 April 2018

    EIA Compliance: Trans Adriatic Pipeline - Albania-Italy pipeline - Prescription A.6

    READ MORE
  • 539_Bonaccia_NW
    Decisions

    Decisions

    10 April 2018

    EIA Compliance: Liquid and gaseous hydrocarbons exploitation concession B.C17.TO - Bonaccia NW...

    READ MORE
  • 1687
    Decisions

    Decisions

    10 April 2018

    EIA Screening: Hydrocarbons exploitation concession "Gela" - Increased injection capacity of...

    READ MORE
  • 1637
    Decisions

    Decisions

    5 April 2018

    EIA: Start of production of the gas well Santa Maria Nuova 003 dir a

    READ MORE

ONGOING PUBLIC CONSULTATION

Plans, programmes and projects for which anyone may SUBMIT COMMENTS

Storage facilities

Environmental Impact Assessment

LPG coastal deposit in Marghera - 32.000 mc of storage

Deadline for submission of comments:  20/04/2018
  • The project involves the construction of a LPG coastal deposit in Marghera consisting of 1 tank of a total capacity of 32.000 mc and of the access areas for the gas supply and distribution through small and medium gas carriers.
  • Map
  • Download
Electrical power lines

Environmental Impact Assessment

Reconstruction of the 132 kV T.153 power line "La Casella - Broni - Arena Po" between the E.S....

Deadline for submission of comments:  21/04/2018
  • The project involves the reconstruction of the 132 kV T.153 "La Casella - Broni - Arena Po" power line between the "La Casella" electric station and the Primary Station "Arena Po" and the replacement of the pylons from no. 1 to n. 27 excluded, the replacement of support no. 83 on the T. 221 "Tavazzano Est - Sarmato" and the installation of a new support no. 53 on the T.860 "Arena PO - Copiano - Cortelona" which will render the T. 860 line independent of T. 153.
  • Map
  • Download
Hydrocarbon exploitation

EIA Screening

Variation of the plant for the production of the well "San Teodoro 1 dir A" with alternative...

Deadline for submission of comments:  21/04/2018
  • The project involves the installation of the utilities for the production of the San Teodoro 1 Dir A well in the San Teodoro field and for the transport of the extracted gas in the existing Basengas pipelines
  • Map
Hydrocarbon exploitation

Environmental Impact Assessment

Drilling of the Gorgoglione 3 well within the exploitation concession named "Gorgoglione"

Deadline for submission of comments:  25/04/2018
  • The project involves the drilling of Gorgoglione 3 well and the construction of an underground pipeline 3 km long to connect the well to the center Tempa Rossa oil.
  • Map
  • Download
Thermal power plant

Environmental Impact Assessment

10 MWe concentrated thermodynamic solar plant called "San Severo agro-energy project"

Deadline for submission of comments:  30/04/2018
  • The project involves the construction of a 10 MWe thermodynamic solar plant and a cultivation of medicinal herbs in the soil spaces between the heliostats. The thermodynamic solar plant is located near the San Severo thermal power plant and is connected to the thermal power plant for supplying water and supplying electrical power to the grid.
  • Map
  • Download
Integrated chemical plants

EIA Screening

Modification of the production unit of Nitrato Ammonico Stamicarbon (NAS) of the Yara plant in...

Deadline for submission of comments:  30/04/2018
  • The project involves the modernization of the production process of ammonium nitrate in order to obtain a final product of greater granulometry (3,5 mm).
  • Map
Ports

Environmental Impact Assessment

Port of Brindisi - Completion of port infrastructure through docks and the contruction of a...

Deadline for submission of comments:  01/05/2018
  • The project involves dredging a part of the seabed, management of excavated sediments and completion of port infrastructure through docks and the contruction of a sediment tank between Pontile Petrolchimico and Costa Morena Est.
  • Map
  • Download
Railways

EIA Screening

HS/HC Milano-Napoli railway. Roma-Napoli section. Access road to Napoli Afragola HS station

Deadline for submission of comments:  05/05/2018
  • The project involves the construction of a road junction to connect the railway station of Afragola and the provincial road (ex SS162) "asse mediano".
  • Map
Storage facilities

EIA Screening

Natural gas onshore storage concession of San Potito and Cotignola - Execution of injection...

Deadline for submission of comments:  05/05/2018
  • The project involves the execution of overpressure injection tests in the "SPT A1dir" and "SPT A2dir" storage wells of San Potito in order to increase the storage capacity in the BB1 field of San Potito by overcoming the static pressure.
  • Map
Ports

Environmental Impact Assessment

Construction of a dock in the left bank of the river Magra in the municipality of Ameglia (SP)

Deadline for submission of comments:  07/05/2018
  • The project involves the construction of a dock of 13.000 square meters and depth -3 s.l.m. for the mooring of boats on the left bank of the river Magra, in the Municipality of Ameglia (SP).
  • Map
  • Download
Ports

Environmental Impact Assessment

Port of Olbia - Construction of a dock for mooring of fish boats serving the storage and...

Deadline for submission of comments:  09/05/2018
  • The project involves the construction of the dock for mooring of fish boats and unloading of the catch in the north coast of the Gulf of Olbia.
  • Map
  • Download
Roads

Environmental Impact Assessment

E78 Grosseto-Fano motorway - Adaptation to 4 lanes in the Grosseto-Siena section (S.S. 223 "di...

Deadline for submission of comments:  09/05/2018
  • The project involves the reconstruction of the viaducts on the Fosso Ornate and on the Merse River and the construction of the streambank protection works on the "Il Picchetto" junction (km 44+400 - 44+600) and on the river Merse (km 50+200 - 50+350).
  • Map
  • Download
Railways

Environmental Impact Assessment

Track-quadrupling of the Fortezza-Verona line southern access to the Brenner Base Tunnel

Deadline for submission of comments:  10/05/2018
  • Map
  • Download
Onshore wind farm

Environmental Impact Assessment

34,5 MW San Pancrazio Torrevecchia onshore wind farm in the municipality of San Pancrazio...

Deadline for submission of comments:  14/05/2018
  • The project involves the construction of the on-shore wind farm in the municipality of San Pancrazio Salentino consisting of 10 wind turbines with a total capacity of 34,5 MW and works for connecting the plant to the power grid.
  • Map
  • Download
Electrical power lines

EIA Screening

New 132 kV "Franchini acciai" electrical substation and 132 kV single circuit power line for...

Deadline for submission of comments:  17/05/2018
  • The project involves the construction of the 132 kV overhead single circuit power line to connect the new Franchini Acciai electrical station to the existing electrical station of Brandico.
  • Map
Natural gas pipelines

Environmental Impact Assessment

Construction and management of the natural gas pipeline in some municipalities of Salerno

Deadline for submission of comments:  18/05/2018
  • The project involves the construction of a pipeline about 220 km long for the transport of natural gas with a density of 0.72 kg /m3 under standard conditions at a maximum working pressure of 12 bar.
  • Map
  • Download
Thermal power plant

EIA Screening

Brindisi sud "Federico II" thermal power plant - Construction of tanks for runoff and first...

Deadline for submission of comments:  25/05/2018
  • The project involves the construction and upgrading of rain water and runoff water collection systems at the Brindisi Sud - Federico II thermal power plant.
  • Map
Hydrocarbons exploration

Environmental Impact Assessment

Seismic mapping in the area of hydrocarbons exploration permit "d 84F.R-EL"

Deadline for submission of comments:  25/05/2018
  • The project involves the geophysical surveys with the reflection technique over an area of 300 km2 within the hydrocarbons exploration permit "d 84F.R-EL".
  • Map
  • Download
Natural gas pipelines

EIA Screening

Asti-Cuneo gas pipeline - Variants for construction launchers/catchers pig plant

Deadline for submission of comments:  27/05/2018
  • The project involves the construction of some plant variants to the Asti - Cuneo gas pipeline to make it inspectable internally by PIG. The elimination and removal of the unused sections of the pipeline/plants is also planned.
  • Map
Hydroelectric facility

Environmental Impact Assessment

Hydroelectric facility of Agosta (RM)

Deadline for submission of comments:  05/06/2018
  • The project involves the construction of the hydroelectric facility in the municipality of Agosta with Aniene river diversion at an altitude of 342 m and related works for connection to the electricity grid.
  • Map
  • Download
Onshore wind farm

Environmental Impact Assessment

Repowering of the Mineo-Militello-Vizzini wind farm - Total power of 121,8 MW

Deadline for submission of comments:  09/06/2018
  • The project involves the dismantling of 59 existing wind turbines and the construction of a wind farm composed of 29 wind turbines for a total power of 121,8 MW.
  • Map
  • Download
Airports

Environmental Impact Assessment

Treviso airport - Planning and optimization in 2030

Deadline for submission of comments:  10/06/2018
  • The project involves the airport infrastructure adaptation by runway maintenance, the creation of a new control tower, the adaptation of the RESA areas, the implementation of a new fuel tank and the firehouse, expanding passenger terminals and works on roads and car parks.
  • Map
  • Download
 

SECTIONS

News from the Directorate-GeneralNews from the Directorate-General
DecisionsDecisions
Submit CommentsSubmit Comments
News and EventsNews and Events
StatisticsStatistics
Environmental DataEnvironmental Data
Legal AreaLegal Area
Transboundary consultationsTransboundary consultations
Create your mapCreate your map

Logo MATTM

www.governo.it

Search

  • Plans and Programmes
  • Projects

Procedures

  • On-going Procedures
  • Notices to the public - EIA
  • Notices to the public - EIA Screening
  • Submit Comments
  • Decisions
  • Transboundary consultations
  • Integrated and coordinated procedures
  • Statistics
  • Environmental Observatories

Data and tools

  • Environmental Data
  • Technical specifications and forms
  • Legislation
  • Sector studies and investigations

Communic-Action

  • Citizen Area
  • Developer Area
  • News and Events
  • Decisions 2018
  • News from the Directorate-General
  • Legal Area

Links

  • SEA and EIA at regional level
  • IPPC permit
  • Links

Utility

  • Site map
  • RSS FEED
  • Web Accessibility
  • Cookie policy
CSS validatore HMTL5 validatore
Copyright M.A.T.T.M 2017. Tutti i diritti riservati