Environmental Assessments and Authorizations: SEA - EIA - IPPC Permit

You are in:

150 kV double circuit overhead power line Troia electrical substation - Troia Primary station - Troia EOS1 electrical substation and connected works


General information

Work: 150 kV double circuit overhead power line Troia electrical substation - Troia Primary station

Project: 150 kV double circuit overhead power line Troia electrical substation - Troia Primary station - Troia EOS1 electrical substation and connected works

Description: The project involves the construction of two new sections of the 150 kV double circuit overhead power line from Troia electrical substation to Troia primary substation and from the primary station to Troia/EOS1 electrical substation and the modification to the existing 150 kV overhead single circuit power line PS Orsara - PS Troia - ES Troia/EOS1. The total length of the double-circuit power line is about 10.7 km and 6.2 km for the connections on piling . The project allows to increase the reliability and continuity of the transmission system against the growing production of electricity from renewable sources in the Province of Foggia.

Developer: Terna Rete Elettrica Nazionale S.p.A.

Project type: Electrical power lines

Deadline for submission of comments: 18/07/2015 mail

Other projects related to the same work: Show / Hide

Territories and marine areas

Map

Regions: Puglia

Provinces: Foggia

Municipalities: Troia

Marine areas: None

Select procedure

Procedure Procedure Code Starting date Stage of the procedure
Environmental Impact Assessment 2413 21/06/2013 Concluded Procedure details Documents