Work: Rationalization of the 220 kV electricity grid in the municipality of Terni
Project: Rationalization of the 220 kV electricity grid in the municipality of Terni - Air shifting of the Pietrafitta-Villavalle power line (Borgo Rivo, Campitello and Fontana di Polo) along the line of the closed Villavalle-San Dalmazio power line
Description: The project involves the construction of a new connection about 470 m long from pylon no. 21 of the "Villavalle-Pietrafitta" power line to pylon no. 21 of the "Villavalle-San Dalmazio" power line; the reactivation of the power line "Villavalle-San Dalmazio" between the pylons 21 and 34 for a total of approximately 4.4 km and the construction of a new connection about 730 m long from pylon no. 34 of the "Villavalle-San Dalmazio" power line to pylon no. 44 of the "Villavalle-Pietrafitta" power line.
Developer: Terna Rete Italia S.p.A.
Project type: Electrical power lines
Deadline for submission of comments: 11/03/2018 mail
Regions: Umbria
Provinces: Terni
Municipalities: Terni
Marine areas: None
Procedure | Procedure Code | Starting date | Stage of the procedure | ||
---|---|---|---|---|---|
EIA Screening | 3242 | 22/12/2015 | Concluded | Procedure details | Documents |