Environmental Assessments and Authorizations: SEA - EIA - IPPC Permit

You are in:

EIA Follow-up (Strategic works Law 443/2001): New connection Palermo-Catania - Doubling of the track between Bicocca-Catenanuova. Elimination of the level crossing at km 3+639

611_catenanuova_bicocca

30/06/2016

The EIA Follow-up determination - stage 2 (DVA-DEC-2016-0000253 of 30 June 2016) related to the new connection Palermo-Catania - Doubling of the track between Bicocca-Catenanuova. Elimination of the level crossing at km 3+639 has been issued with favourable outcome.

Go to the project

Download the determination