Work: Oil coastal deposit near the dock Costa Morena riva of the port of Brindisi
Project: Construction of a oil coastal deposit - diesel and petrol - with the cargo terminal near the dock Costa Morena riva in the port of Brindisi
Description: The project involves the construction of a oil coastal deposit (8 tanks) for the storage of hydrocarbons (diesel and petrol) with the cargo terminal. The deposit will be connected through a pipeline 540 m long to the dock of the port of Brindisi.
Developer: Brundisium S.p.A.
Project type: Marine terminals
Regions: Puglia
Provinces: Brindisi
Municipalities: Brindisi
Marine areas: Mar Adriatico Meridionale
Procedure | Procedure Code | Starting date | Stage of the procedure | ||
---|---|---|---|---|---|
Environmental Impact Assessment | 9592 | 14/03/2023 | EIA-SEA Technical Committee's assessment | Procedure details | Documents |
Environmental Impact Assessment | 3123 | 09/09/2015 | Concluded | Procedure details | Documents |