IPPC permit for substantial changes |
127/16024 |
18/03/2024 |
on-going procedure |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/16024 |
Reference of previous authorization's Act: |
DM 38 del 20/01/2022 |
Ministry Protocol Application submission: |
prot. MASE/51489 |
Ministry Protocol date of application submission: |
18/03/2024 |
Subject: |
costruzione di un impianto di pre-condizionamento resine all'interno dell'impianto produttivo EG della Unità Produttiva Perossidati |
Procedure starting date : |
22/03/2024 |
Launch of public consultation: |
22/03/2024 |
Deadline of submission of Public Comments on IPPC permit: |
21/04/2024 |
Stage of the Procedure: |
on-going procedure |
IPPC permit’s reconsideration |
127/15669 |
25/01/2024 |
IPPC Technical Committee's assessment |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/15669 |
Reference of previous authorization's Act: |
DM 38 del 20/01/2022 |
Ministry Protocol Application submission: |
prot. MASE/11683 |
Ministry Protocol date of application submission: |
25/01/2024 |
Subject: |
riesame parziale |
Procedure starting date : |
26/01/2024 |
Launch of public consultation: |
26/01/2024 |
Deadline of submission of Public Comments on IPPC permit: |
25/02/2024 |
Stage of the Procedure: |
IPPC Technical Committee's assessment |
IPPC permit for non substantial changes |
127/15392 |
30/11/2023 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/15392 |
Reference of previous authorization's Act: |
DM 38 del 20/01/2022 |
Application submission date: |
30/11/2023 |
Ministry Protocol date of application submission: |
30/11/2023 |
Procedure starting date : |
07/12/2023 |
Launch of public consultation: |
07/12/2023 |
Deadline of submission of Public Comments on IPPC permit: |
06/01/2024 |
Decision Number: |
MASE - 2024 - 022111 |
Decision Date: |
06/02/2024 |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
127/14123 |
20/02/2023 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/14123 |
Reference of previous authorization's Act: |
DM 38 del 20/01/2022 |
Application submission date: |
17/02/2023 |
Ministry Protocol Application submission: |
prot. MiTE-2023-23892 |
Ministry Protocol date of application submission: |
20/02/2023 |
Subject: |
emissioni 3/B 3/E 3/H 3/I impianto produttivo acqua ossigenata di grado tecnico unità produttiva Perossidati'impianto |
Procedure starting date : |
21/02/2023 |
Launch of public consultation: |
21/02/2023 |
Deadline of submission of Public Comments on IPPC permit: |
23/03/2023 |
Decision Number: |
MASE - 2024 - 053306 |
Decision Date: |
20/03/2024 |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
127/13224 |
22/06/2022 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/13224 |
Reference of previous authorization's Act: |
DM 503 del 2 dicembre 2021 |
Application submission date: |
21/06/2022 |
Ministry Protocol Application submission: |
prot. MITE-2022-77997 |
Ministry Protocol date of application submission: |
22/06/2022 |
Procedure starting date : |
02/09/2022 |
Launch of public consultation: |
02/09/2022 |
Decision Number: |
Prot. n. CIPPC/1542 |
Decision Date: |
09/11/2022 |
Decisions' Outcome: |
positivo |
Date of notification to the developer of the procedure outcomes: |
14/11/2022 |
Notification Reference number: |
MITE - 2022 - 141887 |
Outcome: |
positivo |
Stage of the Procedure: |
Concluded |
Reconsideration of compliance to permit conditions |
127/12838 |
05/05/2022 |
Administrative control |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/12838 |
Reference of previous authorization's Act: |
D.M. 38 del 20/01/2022 |
Ministry Protocol Application submission: |
prot. MITE-2022-57777 |
Ministry Protocol date of application submission: |
05/05/2022 |
Procedure starting date : |
27/05/2022 |
Launch of public consultation: |
27/05/2022 |
Deadline of submission of Public Comments on IPPC permit: |
26/06/2022 |
Stage of the Procedure: |
Administrative control |
IPPC permit for non substantial changes |
127/12286 |
12/01/2022 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/12286 |
Reference of previous authorization's Act: |
DM 177 del 7/8/2015 |
Application submission date: |
11/01/2022 |
Ministry Protocol Application submission: |
MITE-2022-2900 |
Ministry Protocol date of application submission: |
12/01/2022 |
Subject: |
Nuovo impianto di trasporto pneumatico del cloruro di calcio solido, |
Procedure starting date : |
04/02/2022 |
Decision Number: |
MASE - 2024 - 024831 |
Decision Date: |
08/02/2024 |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
127/11584 |
27/05/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/11584 |
Reference of previous authorization's Act: |
D.M. 177/2015 |
Application submission date: |
25/05/2021 |
Ministry Protocol Application submission: |
MATTM-2021-56776 |
Ministry Protocol date of application submission: |
27/05/2021 |
Subject: |
Comunicazione di modifica non sostanziale per Installazione del nuovo Impianto di rilavorazione Soda Leggera presso l'UP Sodiera della Società Solvay Chimica Italia S.p.A. |
Decision Number: |
Nota prot MITE - 2022 - 159808 |
Decision Date: |
19/12/2022 |
Date of notification to the developer of the procedure outcomes: |
19/12/2022 |
Notification Reference number: |
MITE - 2022 - 159808 |
Outcome: |
positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
127/11207 |
13/01/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/11207 |
Ministry Protocol date of application submission: |
13/01/2021 |
Procedure starting date : |
26/01/2021 |
Launch of public consultation: |
27/01/2021 |
Date of notification to the developer of the procedure outcomes: |
17/05/2021 |
Notification Reference number: |
Prot. 52495 |
Outcome: |
positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for substantial changes |
127/11072 |
06/10/2020 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/11072 |
Reference of previous authorization's Act: |
D.M. 177 |
Application submission date: |
06/10/2020 |
Ministry Protocol Application submission: |
MATTM_81592 |
Ministry Protocol date of application submission: |
14/10/2020 |
Subject: |
Istanza di modifica per l'installazione di un nuovo impianto di produzione presso l'ex-area di produzione del percarbonato di sodio (PCS) della soc. Solvay Italia S.p.A |
Procedure starting date : |
19/11/2020 |
Launch of public consultation: |
02/12/2020 |
Deadline of submission of Public Comments on IPPC permit: |
01/01/2021 |
Decision Number: |
DM 503 |
Decision Date: |
01/12/2021 |
Decisions' Outcome: |
POSITIVO |
Date of notification to the developer of the procedure outcomes: |
07/12/2021 |
Notification Reference number: |
MATTM-2021-136873 |
Outcome: |
positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
127/10807 |
15/06/2020 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/10807 |
Reference of previous authorization's Act: |
DM 177/2015 |
Application submission date: |
15/06/2020 |
Ministry Protocol Application submission: |
MATTM/46397 |
Ministry Protocol date of application submission: |
15/06/2020 |
Subject: |
MnS per unità produttiva clorometani |
Decision Number: |
DM 40 |
Decision Date: |
20/01/2022 |
Date of notification to the developer of the procedure outcomes: |
27/01/2022 |
Notification Reference number: |
MITE-2022-9412 |
Outcome: |
positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
127/10469 |
24/10/2019 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/10469 |
Reference of previous authorization's Act: |
D.M. 177/2015 |
Application submission date: |
24/10/2019 |
Ministry Protocol Application submission: |
DVA/2019/28437 |
Ministry Protocol date of application submission: |
29/10/2019 |
Procedure starting date : |
06/11/2019 |
Decision Number: |
MATTM-2020-89512 |
Decision Date: |
03/11/2020 |
Stage of the Procedure: |
Concluded |
IPPC permit’s reconsideration |
127/10032 |
28/02/2019 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/10032 |
Reference of previous authorization's Act: |
D.M. 177/2015 |
Application submission date: |
28/02/2019 |
Ministry Protocol Application submission: |
DVA/2019/5271 |
Ministry Protocol date of application submission: |
01/03/2019 |
Subject: |
Riesame complessivo dell'AIA |
Procedure starting date : |
12/03/2019 |
Launch of public consultation: |
26/03/2019 |
Deadline of submission of Public Comments on IPPC permit: |
25/04/2019 |
Decision Number: |
DM 38 |
Decision Date: |
20/01/2022 |
Decisions' Outcome: |
positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
127/9721 |
09/11/2018 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/9721 |
Reference of previous authorization's Act: |
DM 177 del 07/08/2015 |
Application submission date: |
05/11/2018 |
Ministry Protocol Application submission: |
DVA/2018/25173 |
Ministry Protocol date of application submission: |
09/11/2018 |
Subject: |
modifica dell'Unità produttiva Elettrolisi (sezione produzione ipoclorido di sodio) |
Procedure starting date : |
20/11/2018 |
Decision Number: |
DVA/2019/14031 |
Decision Date: |
03/06/2019 |
Decisions' Outcome: |
Positivo |
Date of notification to the developer of the procedure outcomes: |
03/06/2019 |
Notification Reference number: |
DVA/2019/14031 |
Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
127/1222 |
17/07/2018 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/1222 |
Application submission date: |
27/06/2018 |
Ministry Protocol Application submission: |
14939/DVA |
Ministry Protocol date of application submission: |
27/06/2018 |
Subject: |
Costruzione nuovo bacino di diversione. |
Procedure starting date : |
17/07/2018 |
Decision Number: |
DVA-2018-20970 |
Decision Date: |
19/09/2018 |
Decisions' Outcome: |
Positivo |
Date of notification to the developer of the procedure outcomes: |
19/09/2018 |
Notification Reference number: |
DVA-2018-20970 |
Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for substantial changes |
127/1217 |
08/06/2018 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/1217 |
Application submission date: |
29/05/2018 |
Ministry Protocol Application submission: |
DVA/12460 |
Ministry Protocol date of application submission: |
30/05/2018 |
Subject: |
nuovo impianto di insaccamento della soda leggera |
Procedure starting date : |
08/06/2018 |
Decision Number: |
DEC MIN 11 |
Decision Date: |
23/01/2019 |
Date of notification to the developer of the procedure outcomes: |
28/01/2019 |
Notification Reference number: |
DVA/2019/1912 |
Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for substantial changes |
127/1218 |
08/06/2018 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/1218 |
Application submission date: |
29/05/2018 |
Ministry Protocol Application submission: |
12448/DVA |
Ministry Protocol date of application submission: |
29/05/2018 |
Subject: |
prescrizioni sui valori limite di emissione e monitoraggio degli inquinanti ai camini dei 'lavatori colonna' (1/A-L4, 1/A-L5, 1/A-L6 e 1/A-L7) di cui al DM 173/2017 del 28/06/2017, alle prescrizioni relative al tenore di ossigeno di riferimento al punto di emissione 1/D e al deposito preliminare di rifiuti contenenti mercurio |
Procedure starting date : |
08/06/2018 |
Decision Number: |
DM 327 |
Decision Date: |
27/11/2018 |
Decisions' Outcome: |
Positivo |
Date of notification to the developer of the procedure outcomes: |
05/12/2018 |
Notification Reference number: |
DVA/2018/27478 |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
127/1196 |
12/04/2018 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/1196 |
Application submission date: |
28/03/2018 |
Ministry Protocol Application submission: |
DVA 7565 |
Ministry Protocol date of application submission: |
29/03/2018 |
Subject: |
avvio procedimento per modifica proprie emissioni verso impianto "SIAD" autorizzato in ambito regionale con lo scopo di recupero parziale dell' anidride carbonica |
Procedure starting date : |
12/04/2018 |
Decision Number: |
DVA- 2018-20718 |
Decision Date: |
17/09/2018 |
Decisions' Outcome: |
positivo |
Date of notification to the developer of the procedure outcomes: |
17/09/2018 |
Notification Reference number: |
DVA- 2018-20718 |
Outcome: |
positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
127/1166 |
02/10/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/1166 |
Application submission date: |
07/09/2017 |
Ministry Protocol Application submission: |
20005/DVA |
Ministry Protocol date of application submission: |
07/09/2017 |
Subject: |
costruzione nuova torre TRG3 in sostituzione della TRG1 |
Procedure starting date : |
02/10/2017 |
Decision Number: |
28126/DVA |
Decision Date: |
04/12/2017 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit’s reconsideration |
127/1151 |
20/06/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/1151 |
Application submission date: |
09/06/2017 |
Ministry Protocol Application submission: |
13674/DVA |
Ministry Protocol date of application submission: |
12/06/2017 |
Procedure starting date : |
20/06/2017 |
Decision Number: |
D.M. 281 |
Decision Date: |
16/10/2017 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
127/1125 |
24/02/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/1125 |
Application submission date: |
07/02/2017 |
Ministry Protocol Application submission: |
2858/DVA |
Ministry Protocol date of application submission: |
08/02/2017 |
Subject: |
Raddoppio linee produttive impianto EG |
Procedure starting date : |
24/02/2017 |
Decision Number: |
D.M. 132 |
Decision Date: |
26/05/2017 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit’s reconsideration |
127/1096 |
10/10/2016 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/1096 |
Application submission date: |
29/09/2016 |
Ministry Protocol Application submission: |
23880/DVA |
Ministry Protocol date of application submission: |
30/09/2016 |
Procedure starting date : |
10/10/2016 |
Decision Number: |
D.M. 173 |
Decision Date: |
28/06/2017 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
Reconsideration of compliance to permit conditions |
127/1090 |
07/09/2016 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/1090 |
Application submission date: |
16/08/2016 |
Ministry Protocol Application submission: |
21027 |
Ministry Protocol date of application submission: |
16/08/2016 |
Subject: |
Prescrizione n.31 del PIC |
Procedure starting date : |
07/09/2016 |
Decision Number: |
6242/DVA |
Decision Date: |
15/03/2017 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
Reconsideration of compliance to permit conditions |
127/1091 |
07/09/2016 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/1091 |
Application submission date: |
11/08/2016 |
Ministry Protocol Application submission: |
20995 |
Ministry Protocol date of application submission: |
16/08/2016 |
Subject: |
Verifica ottemperanza prescrizione n. 30 del PIC |
Procedure starting date : |
07/09/2016 |
Decision Number: |
6439/DVA |
Decision Date: |
17/03/2017 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit’s reconsideration |
127/1089 |
05/09/2016 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/1089 |
Application submission date: |
18/08/2016 |
Ministry Protocol Application submission: |
21102 |
Ministry Protocol date of application submission: |
19/08/2016 |
Subject: |
Modifica prescrizione n.19 del PIC |
Procedure starting date : |
05/09/2016 |
Decision Number: |
DM 141 |
Decision Date: |
11/04/2018 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
Reconsideration of compliance to permit conditions |
127/1083 |
01/08/2016 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/1083 |
Application submission date: |
21/07/2016 |
Ministry Protocol Application submission: |
19221/DVA |
Ministry Protocol date of application submission: |
21/07/2016 |
Subject: |
Prescrizione n. 9 - 9b |
Procedure starting date : |
01/08/2016 |
Decision Number: |
10751/DVA |
Decision Date: |
08/05/2017 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
Reconsideration of compliance to permit conditions |
127/1077 |
13/06/2016 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/1077 |
Application submission date: |
06/06/2016 |
Ministry Protocol Application submission: |
15200/DVA |
Ministry Protocol date of application submission: |
07/06/2016 |
Subject: |
Ottemperanza prescrizione art.1, comma 3 |
Procedure starting date : |
13/06/2016 |
Decision Number: |
8303/DVA |
Decision Date: |
05/04/2017 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
Reconsideration of compliance to permit conditions |
127/1070 |
26/04/2016 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/1070 |
Application submission date: |
15/04/2016 |
Ministry Protocol Application submission: |
10329/DVA |
Ministry Protocol date of application submission: |
18/04/2016 |
Subject: |
Prescrizione 10b del PIC |
Procedure starting date : |
26/04/2016 |
Decision Number: |
6447/DVA |
Decision Date: |
17/03/2017 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit’s reconsideration |
127/1033 |
02/03/2016 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/1033 |
Application submission date: |
07/01/2016 |
Ministry Protocol Application submission: |
201 |
Ministry Protocol date of application submission: |
08/01/2016 |
Subject: |
Relazione di Riferimento |
Procedure starting date : |
02/03/2016 |
Decision Number: |
30821/DVA |
Decision Date: |
21/12/2016 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
Reconsideration of compliance to permit conditions |
127/1048 |
02/03/2016 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/1048 |
Application submission date: |
17/02/2016 |
Ministry Protocol Application submission: |
4162/DVA |
Ministry Protocol date of application submission: |
18/02/2016 |
Subject: |
Prescrizione art.1, comma 4 |
Procedure starting date : |
02/03/2016 |
Decision Number: |
10226/DVA |
Decision Date: |
02/05/2017 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
Reconsideration of compliance to permit conditions |
127/960 |
15/12/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/960 |
Application submission date: |
02/12/2015 |
Ministry Protocol Application submission: |
DVA-2015-0030398 |
Ministry Protocol date of application submission: |
03/12/2015 |
Procedure starting date : |
15/12/2015 |
Decision Number: |
15717/DVA |
Decision Date: |
13/06/2016 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
Reconsideration of compliance to permit conditions |
127/961 |
15/12/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/961 |
Application submission date: |
02/12/2015 |
Ministry Protocol Application submission: |
DVA-2015-0030447 |
Ministry Protocol date of application submission: |
03/12/2015 |
Procedure starting date : |
15/12/2015 |
Decision Number: |
6447/DVA |
Decision Date: |
17/03/2017 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit’s reconsideration |
127/949 |
04/11/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/949 |
Application submission date: |
15/10/2015 |
Ministry Protocol Application submission: |
DVA-2015-26041 |
Ministry Protocol date of application submission: |
19/10/2015 |
Procedure starting date : |
04/11/2015 |
Decision Number: |
D.M. 261 |
Decision Date: |
05/10/2016 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit’s reconsideration |
127/938 |
02/10/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/938 |
Application submission date: |
17/09/2015 |
Ministry Protocol Application submission: |
DVA-2015-0023389 |
Ministry Protocol date of application submission: |
17/09/2015 |
Subject: |
Riesame per nuova parte d'impianto "Unità produttiva Sodiera e Cloruro di Calcio" |
Procedure starting date : |
02/10/2015 |
Decision Number: |
D.M. 65 |
Decision Date: |
16/03/2017 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit’s reconsideration |
127/819 |
14/10/2014 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/819 |
Application submission date: |
01/10/2014 |
Ministry Protocol Application submission: |
DVADEC-2014-0000278 |
Ministry Protocol date of application submission: |
01/10/2014 |
Subject: |
Riesame Decreto AIA DVA-DEC-2010-0000496 del 06/08/2010 |
Procedure starting date : |
14/10/2014 |
Decision Number: |
DM 177 |
Decision Date: |
07/08/2015 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
127/801 |
08/09/2014 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/801 |
Application submission date: |
16/07/2014 |
Ministry Protocol Application submission: |
DVA-2014-0023728 |
Ministry Protocol date of application submission: |
17/07/2014 |
Subject: |
Modifica non sostanziale relativamente al progetto di sostituzione dell'attuale sistema di recupero con olio dei clorometani da corrente gassosa. |
Procedure starting date : |
08/09/2014 |
Decision Number: |
16471/DVA |
Decision Date: |
21/06/2016 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
127/802 |
08/09/2014 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/802 |
Application submission date: |
01/07/2014 |
Ministry Protocol Application submission: |
DVA-2014-0021813 |
Ministry Protocol date of application submission: |
02/07/2014 |
Subject: |
Modifica non sostanziale riguardo l'installazione di una unità di produzione di acido peracetico. |
Procedure starting date : |
08/09/2014 |
Decision Number: |
13063/DVA |
Decision Date: |
13/05/2016 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
127/465 |
05/12/2012 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/465 |
Application submission date: |
15/10/2012 |
Ministry Protocol Application submission: |
DVA - 2012 - 0026130 |
Ministry Protocol date of application submission: |
29/10/2012 |
Subject: |
Modifica non sostanziale per realizzazione di un impianto trattamento delle acque di falda "Impianto TAF" che sostituirà quello in precedenza utilizzato. |
Procedure starting date : |
05/12/2012 |
Decision Number: |
DVA-2013-0015087 |
Decision Date: |
27/06/2013 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
127/434 |
24/10/2012 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/434 |
Application submission date: |
01/10/2012 |
Ministry Protocol Application submission: |
DVA-2012-0023882 |
Ministry Protocol date of application submission: |
04/10/2012 |
Subject: |
Modifica sostanziale per unificazione del procedimento Regionale con il decreto AIA |
Procedure starting date : |
24/10/2012 |
Decision Number: |
DM 177 |
Decision Date: |
07/08/2015 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
127/310 |
01/02/2012 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127/310 |
Application submission date: |
28/10/2011 |
Ministry Protocol Application submission: |
DVA - 2011 - 0027729 |
Ministry Protocol date of application submission: |
07/11/2011 |
Subject: |
modifica prescrizioni in relazione al contenuto di boro nell'acqua in ingresso dello stabilimento |
Procedure starting date : |
01/02/2012 |
Decision Number: |
DM 177 |
Decision Date: |
07/08/2015 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
First IPPC permit for existing installation |
127 |
10/04/2007 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
127 |
Application submission date: |
30/03/2007 |
Ministry Protocol Application submission: |
DSA-2007-0010419 |
Ministry Protocol date of application submission: |
10/04/2007 |
Date of request for integrations: |
08/05/2008 |
IPPC Committee's opinion date: |
04/03/2010 |
Services Conference call date: |
24/03/2010 |
Decision Number: |
DVA - DEC - 2010 - 0000496 |
Decision Date: |
06/08/2010 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |