Unsubstantial project changes (Strategic works Law 443/2001) |
3989 |
20/03/2018 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3989 |
Subject
: |
Macrolotto 3 parte 1 dal km 139+000 al km 148+000 - Interventi di sistemazione dello smarino di galleria depositato nelle immediate vicinanze della finestra intermedia della galleria Serra Rotonda e n.4 interventi di miglioramento fondiario |
Date of application submission: |
20/03/2018 |
Technical assessment starting date: |
26/03/2018 |
Date of notification to the developer of the procedure outcomes: |
29/05/2018 |
Date of the Opinion of the National Technical Commission : |
11/05/2018 |
National Technical Commission Opinion number: |
2723 |
National Technical Commission Opinion outcome: |
Positivo con prescrizioni |
Notification Reference number: |
DVA-DEC-2018-0000251 |
Outcome: |
Positivo con prescrizioni |
Responsible of the procedure: |
Carlo Di Gianfrancesco - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
Unsubstantial project changes (Strategic works Law 443/2001) |
3554 |
10/02/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3554 |
Subject
: |
Macrolotto 3 parte 1 dal km 139+000 al km 148+000 - Gestione delle terre e rocce da scavo e sistemazioni finali e messa in sicurezza della finestra di accesso alla galleria Serra Rotonda |
Date of application submission: |
10/02/2017 |
Technical assessment starting date: |
20/02/2017 |
Date of notification to the developer of the procedure outcomes: |
31/05/2017 |
Date of the Opinion of the National Technical Commission : |
12/05/2017 |
National Technical Commission Opinion number: |
2839 |
National Technical Commission Opinion outcome: |
Parte negativo e parte positivo |
Notification Reference number: |
DVA-DEC-2017-0000166 |
Outcome: |
Parte negativo e parte positivo |
Responsible of the procedure: |
Carlo Di Gianfrancesco - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
Unsubstantial project changes (Strategic works Law 443/2001) |
3376 |
20/06/2016 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3376 |
Subject
: |
Macrolotto 3, parte 2 dal km 153+400 al km 173+900. Variante relativa a modifiche di carattere architettonico e/o compositivo |
Date of application submission: |
20/06/2016 |
Technical assessment starting date: |
29/09/2016 |
Date of notification to the developer of the procedure outcomes: |
29/12/2016 |
Date of the Opinion of the National Technical Commission : |
13/12/2016 |
National Technical Commission Opinion number: |
2260 |
National Technical Commission Opinion outcome: |
Positivo |
Notification Reference number: |
DVA-DEC-2016-0000466 |
Outcome: |
Positivo |
Responsible of the procedure: |
Carlo Di Gianfrancesco - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
Unsubstantial project changes (Strategic works Law 443/2001) |
3025 |
25/05/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3025 |
Subject
: |
Macrolotto 3, parte 2 dal km 153+400 al km 173+900. Interventi di aggiornamento del piano di cantierizzazione e della gestione delle TRS e del materiale proveniente da demolizioni. |
Date of application submission: |
25/05/2015 |
Technical assessment starting date: |
26/05/2015 |
Date of notification to the developer of the procedure outcomes: |
13/07/2015 |
Date of the Opinion of the National Technical Commission : |
26/06/2015 |
National Technical Commission Opinion number: |
1824 |
National Technical Commission Opinion outcome: |
Positivo |
Notification Reference number: |
DVA-DEC-2015-0000258 |
Outcome: |
Positivo |
Responsible of the procedure: |
Carlo Di Gianfrancesco - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
Unsubstantial project changes (Strategic works Law 443/2001) |
2769 |
19/06/2014 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
2769 |
Subject
: |
Macrolotto 3 parte I dal km 139+000 al km 148+000. Variante relativa alla sistemazione degli imbocchi lato Salerno della galleria Serra Rotonda. |
Date of application submission: |
19/06/2014 |
Technical assessment starting date: |
26/06/2014 |
Date of notification to the developer of the procedure outcomes: |
17/10/2014 |
Date of the Opinion of the National Technical Commission : |
19/09/2014 |
National Technical Commission Opinion number: |
1615 |
National Technical Commission Opinion outcome: |
Positivo |
Notification Reference number: |
DVA-2014-0033467 |
Outcome: |
Positivo |
Responsible of the procedure: |
Carlo Di Gianfrancesco - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
Unsubstantial project changes (Strategic works Law 443/2001) |
2678 |
03/03/2014 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
2678 |
Subject
: |
Macrolotto 3 parte 3 dal km 173+900 al km 185+000. Progetto costruttivo e adeguamenti ambientali. |
Date of application submission: |
03/03/2014 |
Technical assessment starting date: |
10/03/2014 |
Date of notification to the developer of the procedure outcomes: |
10/09/2014 |
Notification Reference number: |
DVA-2014-0028709 |
Responsible of the procedure: |
Carlo Di Gianfrancesco - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
Unsubstantial project changes (Strategic works Law 443/2001) |
2664 |
18/02/2014 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
2664 |
Subject
: |
Macrolotto 3 parte I dal km 139+000 al km 148+000. Proposta di approvazione della variante per la sostituzione delle gallerie artificiali. |
Date of application submission: |
18/02/2014 |
Technical assessment starting date: |
25/02/2014 |
Date of notification to the developer of the procedure outcomes: |
05/08/2014 |
Date of the Opinion of the National Technical Commission : |
04/07/2014 |
National Technical Commission Opinion number: |
1546 |
National Technical Commission Opinion outcome: |
Positivo |
Notification Reference number: |
DVA-2014-0025981 |
Outcome: |
Positivo |
Responsible of the procedure: |
Carlo Di Gianfrancesco - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
Unsubstantial project changes (Strategic works Law 443/2001) |
2575 |
25/10/2013 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
2575 |
Subject
: |
Macrolotto 3, parte 2 - dal km 153+400 al km 173+900. Modifiche plano-altimetriche, adeguamenti progetti di cantierizzazione e omogenizzazione delle tipologie di viadotti. |
Date of application submission: |
25/10/2013 |
Technical assessment starting date: |
11/11/2013 |
Date of notification to the developer of the procedure outcomes: |
14/07/2014 |
Republication date of the notice in newspapers: |
22/02/2014 |
Deadline of submission of Public Comments on the republished project: |
24/03/2014 |
Date of integrations related to the republished project receipt: |
25/02/2014 |
Date of the Opinion of the National Technical Commission : |
23/05/2014 |
National Technical Commission Opinion number: |
1510 |
National Technical Commission Opinion outcome: |
Positivo |
Notification Reference number: |
DVA-2014-0023218 |
Outcome: |
Positivo |
Responsible of the procedure: |
Carlo Di Gianfrancesco - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
EIA Follow-up (Strategic works Law 443/2001) |
2540 |
18/09/2013 |
EIA-SEA Technical Committee's assessment
|
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
2540 |
Subject
: |
A3 Autostrada SA-RC. Lavori per la messa in sicurezza tra il km 148+000 ed il km 153+400 |
Date of application submission: |
18/09/2013 |
Date of integrations receipt: |
20/02/2017 |
Date of integrations second receipt: |
02/05/2017 |
Date of the Opinion of the National Technical Commission - Stage 1: Adequacy of the executive project to the final project and compliance to the prescriptions: |
26/06/2015 |
National Technical Commission Opinion number - Stage 1: |
1826 |
National Technical Commission Opinion outcome - Stage 1: |
Positivo |
Determination date - Stage 1: Adequacy of the executive project to the final project and prescriptions compliance : |
15/07/2015 |
Determination number - Stage 1 : |
DVA-DEC-2015-0000260 |
Determination outcome - Stage 1: |
Positivo |
Responsible of the procedure: |
Carlo Di Gianfrancesco - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
EIA-SEA Technical Committee's assessment
|
EIA Follow-up (Strategic works Law 443/2001) |
2505 |
07/08/2013 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
2505 |
Subject
: |
Lavori di ammodernamento ed adeguamento al tipo 1/A delle norme CNR/80 dal km 153+400 al km 173+900 - 3° Macrolotto, parte 2°. |
Date of application submission: |
07/08/2013 |
Date of notification to the developer of the procedure outcomes: |
27/06/2019 |
Date of the Opinion of the National Technical Commission - Stage 1: Adequacy of the executive project to the final project and compliance to the prescriptions: |
23/05/2014 |
National Technical Commission Opinion number - Stage 1: |
1510 |
National Technical Commission Opinion outcome - Stage 1: |
Parere Espresso |
Determination date - Stage 1: Adequacy of the executive project to the final project and prescriptions compliance : |
14/07/2014 |
Determination number - Stage 1 : |
DVA-2014-0023218 |
Determination outcome - Stage 1: |
Positivo |
Date of the Opinion of the National Technical Commission - Stage 2: environmental monitoring and prescriptions compliance : |
14/06/2019 |
National Technical Commission Opinion number - Stage 2: |
3046 |
National Technical Commission Opinion outcome - Stage 2: |
Positivo |
Determination date - Stage 2: environmental monitoring and prescriptions compliance : |
21/06/2019 |
Determination number - Stage 2 : |
DVA_DEC_2019-0000216 |
Determination outcome - Stage 2: |
Positivo |
Notification Reference number: |
DVA_DEC_2019-0016580 |
Outcome: |
Positivo |
Notes: |
Determinazione direttoriale - Fase 2 (Monitoraggio ambientale in corso d'opera e rispetto prescrizioni) del 31/07/2015, prot. DVA-DEC-2016-0000290 |
Responsible of the procedure: |
Carlo Di Gianfrancesco - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
Unsubstantial project changes (Strategic works Law 443/2001) |
2031 |
13/09/2012 |
Concluded |
Procedure details
|
|
Procedure Code (ID_VIP/ID_MATTM) |
2031 |
Subject
: |
Lavori per la messa in sicurezza tra il km 148+000 (imbocco nord Galleria Fossino) ed il km 153+400 (svincolo di Laino Borgo) |
Date of application submission: |
13/09/2012 |
Technical assessment starting date: |
24/09/2012 |
Date of notification to the developer of the procedure outcomes: |
08/04/2013 |
Notification Reference number: |
DVA-2013_0008349 |
Outcome: |
Archiviata |
Stage of the Procedure: |
Concluded |
Unsubstantial project changes (Strategic works Law 443/2001) |
2007 |
06/08/2012 |
Concluded |
Procedure details
|
|
Procedure Code (ID_VIP/ID_MATTM) |
2007 |
Subject
: |
Lavori di ammodernamento e adeguamento al tipo 1a delle norme CNR/80 dal km 139+000 al km 148+000 |
Date of application submission: |
06/08/2012 |
Technical assessment starting date: |
24/08/2012 |
Date of notification to the developer of the procedure outcomes: |
17/10/2012 |
Date of the Opinion of the National Technical Commission : |
21/09/2012 |
National Technical Commission Opinion number: |
1047 |
National Technical Commission Opinion outcome: |
Positivo con prescrizioni |
Outcome: |
Positivo con prescrizioni |
Stage of the Procedure: |
Concluded |
EIA Follow-up (Strategic works Law 443/2001) |
1795 |
29/02/2012 |
EIA-SEA Technical Committee's assessment
|
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
1795 |
Subject
: |
Lavori di ammodernamento ed adeguamento al tipo 1/A delle norme CNR/80, dal km 139+000 al km 148+000. Trasmissione dati Monitoraggio ambientale, procedure operative terre e rocce da scavo |
Date of application submission: |
29/02/2012 |
Date of notification to the developer of the procedure outcomes: |
05/08/2019 |
Date of the Opinion of the National Technical Commission - Stage 2: environmental monitoring and prescriptions compliance : |
05/07/2019 |
National Technical Commission Opinion number - Stage 2: |
3072 |
National Technical Commission Opinion outcome - Stage 2: |
Positivo |
Determination date - Stage 2: environmental monitoring and prescriptions compliance : |
29/07/2019 |
Determination number - Stage 2 : |
DVA_DEC_2019-0000278 |
Determination outcome - Stage 2: |
Positivo |
Notification Reference number: |
DVA_2019-0020552 |
Outcome: |
Positivo |
Responsible of the procedure: |
Carlo Di Gianfrancesco - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
EIA-SEA Technical Committee's assessment
|
Unsubstantial project changes (Strategic works Law 443/2001) |
1777 |
23/02/2012 |
Concluded |
Procedure details
|
|
Procedure Code (ID_VIP/ID_MATTM) |
1777 |
Subject
: |
Autostrada SA - RC. Lavori di ammodernamento ed adeguamento al tipo 1/a Norme CNR/80 dal km 139+000 al km 148+000 |
Date of application submission: |
23/02/2012 |
Technical assessment starting date: |
05/03/2012 |
Date of integrations receipt: |
04/05/2012 |
Date of notification to the developer of the procedure outcomes: |
11/06/2012 |
Date of the Opinion of the National Technical Commission : |
25/05/2012 |
National Technical Commission Opinion number: |
945 |
National Technical Commission Opinion outcome: |
Positivo |
Notification Reference number: |
DVA-2012-0013959 |
Outcome: |
Positivo con prescrizioni |
Stage of the Procedure: |
Concluded |
EIA Follow-up (Strategic works Law 443/2001) |
1655 |
09/11/2011 |
Suspended |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
1655 |
Subject
: |
Autostrada SA - RC. Progettazione esecutiva ed esecuzione dei lavori di ammodernamento ed adeguamento al tipo 1/a delle norme CNR/80 - Macrolotto 3° - parte 3° - dal km 173+900 al km 185+000. |
Date of application submission: |
09/11/2011 |
Date of notification to the developer of the procedure outcomes: |
09/05/2019 |
Date of the Opinion of the National Technical Commission - Stage 1: Adequacy of the executive project to the final project and compliance to the prescriptions: |
21/06/2013 |
National Technical Commission Opinion number - Stage 1: |
1272 |
National Technical Commission Opinion outcome - Stage 1: |
Positivo |
Determination date - Stage 1: Adequacy of the executive project to the final project and prescriptions compliance : |
10/09/2013 |
Determination number - Stage 1 : |
DVA-2013-0020587 |
Determination outcome - Stage 1: |
Positivo |
Date of the Opinion of the National Technical Commission - Stage 2: environmental monitoring and prescriptions compliance : |
29/03/2019 |
National Technical Commission Opinion number - Stage 2: |
2982 |
National Technical Commission Opinion outcome - Stage 2: |
Positivo |
Determination date - Stage 2: environmental monitoring and prescriptions compliance : |
23/04/2019 |
Determination number - Stage 2 : |
DVA_DEC_2019-0000155 |
Determination outcome - Stage 2: |
Positivo |
Notification Reference number: |
DVA/2019/11674 |
Outcome: |
Positivo |
Notes: |
Determinazione direttoriale - Fase 2 (Monitoraggio ambientale in corso d'opera e rispetto prescrizioni) del 31/07/2015, prot. DVA-DEC-2015-0000291 |
Responsible of the procedure: |
Carlo Di Gianfrancesco - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Suspended |
Unsubstantial project changes (Strategic works Law 443/2001) |
1621 |
17/10/2011 |
Concluded |
Procedure details
|
|
Procedure Code (ID_VIP/ID_MATTM) |
1621 |
Subject
: |
Autostrada Salerno - Reggio Calabria. Lavori di ammodernamento e adeguamento al tipo 1 a delle norme CNR/80 dal km 139+000 al km 148+000. Macrolotto 3, parte 1^.Proposta di approvazione della Variante per rettifiche geometriche di tracciato e per l'ottemperanza alle prescrizioni espresse nel Parere n. 723 del 10/06/2011 del MATTM. |
Date of application submission: |
17/10/2011 |
Technical assessment starting date: |
31/10/2011 |
Date of notification to the developer of the procedure outcomes: |
07/03/2012 |
Date of the Opinion of the National Technical Commission : |
27/01/2012 |
National Technical Commission Opinion number: |
858 |
National Technical Commission Opinion outcome: |
Parte negativo e parte positivo |
Notification Reference number: |
DVA-2012-0005876 |
Outcome: |
Parte negativo e parte positivo |
Stage of the Procedure: |
Concluded |
EIA Follow-up (Strategic works Law 443/2001) |
480 |
07/10/2010 |
Concluded |
Procedure details
|
|
Procedure Code (ID_VIP/ID_MATTM) |
480 |
Subject
: |
Autostrada A/3 Salerno-Reggio Calabria -Progetto Esecutivo - Lavori di ammodernamento ed adeguamento al tipo 1/A delle norme CNR/80, dal km 139+000 al km 148+000- Macrolotto 3° - parte 1° |
Date of application submission: |
07/10/2010 |
Date of notification to the developer of the procedure outcomes: |
06/07/2011 |
Notification Reference number: |
DVA_2011-0016298 |
Outcome: |
Positivo |
Notes: |
Parere CTVIA n.723 del 10/06/2011 Positivo con prescrizioni |
Stage of the Procedure: |
Concluded |
EIA Compliance (Strategic works Law 443/2001) |
471 |
10/11/2009 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
471 |
Subject
: |
VO su Macrolotto 3, parte 3 dal km 173+900 al km 185+000. Prescrizioni del Decreto n.6920 del 23/01/2002 |
Date of application submission: |
10/11/2009 |
Date of notification to the developer of the procedure outcomes: |
13/07/2010 |
Date of the Opinion of the National Technical Commission : |
29/01/2009 |
National Technical Commission Opinion number: |
418 |
National Technical Commission Opinion outcome: |
Ottemperata |
Notification Reference number: |
DVA_2010-0017366 |
Outcome: |
Ottemperata |
Stage of the Procedure: |
Concluded |
Environmental Impact Assessment |
1253 |
30/06/2000 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
1253 |
Date of application submission: |
30/06/2000 |
Date of the EIA Decree: |
23/01/2002 |
EIA Decree number: |
DEC/VIA/6920 |
EIA Decree outcome: |
Positivo con prescrizioni |
Stage of the Procedure: |
Concluded |